Services towards Manchester : From Chatsworth Road along a path (27 paces) and up a ramp (57 paces, 1:20 slope) to platform. Services towards Warrington : From Derbyshire Lane West along a path (52 paces), up a ramp (57 paces, 1:15 slope) onto the Warrington platform. The path links Chatsworth Road and Derbyshire Lane West down 7 steps, through an underpass (12 paces) and up 7 steps by which means the platforms are linked.